Platform
& Farwah FPSO Painting Repair of Six (6) Crude Tank
Al-Jurf Field.
Cleaning
of Two COT’s Prior Class inspection at Aljurf Field.
Inspection
$ FFS for heat exchanger 301-E05 at Mabruk Field, Oil
Field Construction and Repair.
Visual
Inspection and Ultrasonic Testing (UT) Wall Thickness
Inspection At BD1 Platform & Farwah FPSO Al-Jurf
Field.
Platform
& Farwah FPSO Painting Repair of 6 Crude Oil Tanks at
Al-Jurf Field.
Engineering/RFQ
23 AF, Heli Lounge and Coast Guard Office
Modification in FPSO Farwah.
“Engineering/RFQ
27 AF, Fixing the 30” Pipe Conductor Movement of
Wells B-03, B-10 & BD-01 at Al-Jurf Field.
CFT-LOG-376-2016-PIP
Logistic at Tripoli Marine Based at Al-Jurf Field.
|